[Review conducted by Dr. Arun Dixit and Subir B.]
Subjects that need to be discussed specifically in future lectures:
- Practical Vs. Theory
- Excitement
- Customer Expectations (Voice of customer VOC)
- WoW – or to positively surprise the customer
- Validation from customer during the project.
- Definition of project
- Measurements and when to determine the state of project.
- Data collection – recording – transfer between PI
- Poster for project cycle (From Abhijeet’s blog)
- Milestones definition.
- Customer feedback and followup
- Communication techniques
- Format of documentation
*NOTE to all:
- All projects should have a timeline plan. Without this no project is complete.
- All pages must be in mainpage+ blog format. This is serious and from next week error here will not be tolerated!
- Abhijeet Savant
- ARTI Portable Cookstove
- Webpages in good format, but please make it in the ‘main page + blog’ to get idea of developments
- What is client feedback so far?
- Task for next week:
- Correct website into blog format. Very Important!!!
- Mention client feedback in blog posts.
- Provenant Systems:
- Task for next week:
- Update Contract Review Document in discussion with client.
- Make blog posts. It is OK if there are no words in the posts but images, but make blog posts.
- Task for next week:
- FRP Geodesic dome
- Due to lack of time, this project has not started yet.
- Tasks for next week:
- Can you take it up on your own?
- ARTI Portable Cookstove
- Jyoti Dhumal
- Pages are not in order, font sizes etc are not standard.
- Not many new updates on website. Jyoti needs guidance. Vijay has taken responsibility to guide her.
- Task for next week:
- Correct website.
- More inputs awaiting from Vijay E.
- Sandeep Jundare
- Blogs have not been updated .
- Past tasks not completed
- Grey water cooler
- No development in past two weeks.
- Observation of smell in the air. Need to recirculate air and refill bucket every day with new grey water.
- Tasks for next week:
- Start making new prototype on SolidWorks complete with fan.
- Clean toilets at Pabal:
- No development on the technology front.
- Has spoken to Panchayat head, but she is not convinced.
- Tasks for next week:
- Make plan for clean and maintenance free toilets.
- Rain water harvesting at DIC building:
- Not finalized. Leakages not fixed
- No filter installed.
- Tasks for next week
- Fix rainwater harvesting pipes.
- Plan a filter to be attached.
- Rain guages
- Website not updated.
- Designs not marketed properly.
- Client feedback?
- Tasks for next week:
- Update status of rain guage.(write usefulness of devices)
- .Mayur Daptare
- Vibration charger – Electronics section.
- Website is in order.
- Task for next week:
- Update why transformers are not to be used in the circuit.
- Make clean PCB using following components
- Standard stepper motor (ask Pioneer electronics, Pune)
- 4-phase full wave rectifier (see link)
- Use Schottky diode / germanium diods, check price from Pioneer Electronics, Pune.
- Use simple buck-boost IC, example MC33063AP.
- Low cost weather station:
- Why do you think medical people need weather station?
- Timeline made. very good.
- As per decision, this project will be taken up after the vibration project is completed.
- Tasks for next week:
- Update timeline to make realistic. Do not mention exact dates but how much time each section will take.
- Vibration charger – Electronics section.
- Swami Kalekar
- Vibration Charger – mechanical design
- Website not in “mainpage + blog format”.
- No market survey done.
- Tasks for next week
- Correct blog.
- Make new design on SolidWorks.
- Complete market survey.
- E-commerce bike box:
- First information in order.
- Tasks for next week:
- Call Mr. Hemant Bhange.
- Re-engineering rice planter
- First information not complete.
- SolidWorks drawing not started.
- Tasks for next week:
- Update with rice planter pictures and videos.
- Make Solidworks drawing of project.
- Vibration Charger – mechanical design
- Vijay Erande
- Grey water filter
- Format not in ‘mainpage+blog’.
- External content should be under ‘Notes’ category and not on mainpage.
- No updates in last week on filter performance.
- Design of bio filter missing.
- Tasks for next week:
- Update with new pictures of plants.
- Make design and show on web.
- Give timeline for project.
- Practical study on optimum composting process
- Tasks for next week:
- Make process outline.
- Identify what needs to be researched.
- Tasks for next week:
- Additional tasks for next week:
- Check content of Jyoti and help her in project.
- Check contents of Sandip J. website and write a report to Subir B
- Grey water filter
- Prachi Samarth (absent)
- About page missing contact details.
- POV assignment:
- Tasks:
- Complete assignment by placing on stand.
- Tasks:
- Mechanical prosthetic hand:
- Not in user readable format of title, background, objectives, etc.
- Blog updates good!
- Tasks for next review:
- Update on the measurements of client and how you would proceed on the job. How much time will it take and expected cost of manufacturing.
- Hackberry hand
- Main page not complete.
- Blog updates good.
- Tasks for next week:
- Complete main page with info with clear objectives.
- Add a timeline to the project.
- Talking Ganesha
- Tasks for next review:
- Make a visit to blind school to understand situation. Report on website under new assignment.
- Big target: make TG easy and reliable to use. So in next review
- List problems with current system
- List how to solve these problems?
- Give timeline of project.
- Tasks for next review:
- Vishwas Shinde
- Solar sanitary pad incinerator
- Not in mainpage+blog format. Please correct this as it is required to know the timeline of progress.
- Solidworks drawings are very good.
- Timeline missing.
- Tasks for next review:
- Make pages in ‘mainpage+blog’ format.
- Give timeline.
- Baling machine
- Page format not consistent. Use standard fonts please.
- Not in mainpage + blog format.
- Tasks for next review
- Make pages in ‘mainpage+blog’ format
- Make concept note for small size baling machine as discussed with Mr. Sunil Bhondge of Greeny.
- Solar sanitary pad incinerator
- Dipali Kambale:
- Non-electric Oxygen Enrichment Unit for rural health centers.
- Webpage not in mainpage + blog format.
- Good, webpage is complete. Now please add blog posts to update.
- Timeline missing.
- More doctor’s reviews mare required.
- Visited clients Genrich Membranes and we can start project immediately. Lot of issues written in concept note first draft have been cleared.
- Tasks for next review:
- Start blog posts on the new developments.
- Ask Dr. Kharul to send Concept note 2.
- Make a timeline for first prototype.
- Make an invoice for 30% for fabricating first prototype.
- Ask Parag (Genrich) for old compressors.
- Make visits to more doctors and review oxygen delivery technology.
- Green gym project
- Met Mr. Sontake and discussed the plans.
- Missing description of visit to clients.
- No photographs of place of installation.
- Tasks for next review:
- Update website.
- Update details in a blog post about client visit.
- Make a timeline.
- Visit site and take a picture, or ask client to send some pictures of site.
- Non-electric Oxygen Enrichment Unit for rural health centers.
- Shubham Shembade
- Ambient temperature dryer
- Mainpage+blog format is correct.
- Mainpage content is incomplete since timeline is not there.
- Good post on silica gels, give reference as to where you have taken it from.
- Tasks for next review:
- Make calculations of the dryer. VERY VERY IMPORTANT!!
- Get more details from client such as
- What should be the drying capacity of the dryer, in kg/day?
- If the dryer is used only for rainy season when wild fruits are available, what about the rest of the year? What can be dried by the end-user?
- Do you have electricity supply? forget solar as solar is not available in the monsoons.
- Give reference for your post on silica gel characteristics.
- Make timeline of your project.
- COD hot plate
- Tasks:
- Mention the design requirements.
- Can you give a simple sketch and component list.
- Give timeline.
- Tasks:
- Ambient temperature dryer