Day 2 – Day8 (Date 2-06-2017 to 8-06-2017 )

On start of second day Mr.Lakshman Jadhav sir gave us a assignment of bed preparation and distributes all students in three groups.After that we took the measurements for preparing bed and went to market for material purchasing accordind to requirement of bed.

Material used for preparation of bed :

  1. Square tubes
  2. Plywood
  3. Welding rods
  4. color
  5. Touchwood
  6. Primer ( Redoxide )
  7. Brushes
  8. Thinner
fig1. Prepared bed

Processes Performed During Bed Preparation :

For bed preparation some processes are  performed as follows,

  1. Cutting 
  2. Welding
  3. Grinding
  4. painting
  5. Cutting
  6. Welding
  7. grinding
  8. Deoxydaizing
  9. painting
  10. Setting plywood

TABLE :  COST ESTIMATION

Material Cost :

Labour cost is 15% of total material costLabour cost = 1767 * 0.15                     =Rs  265
Electricity cost is 10% of total material costElectricity cost = 1767 * 0.10                           = Rs 177
Therefore , total cost = 1767+265+177
                                    =Rs 2209