• Contact
  • Login
DESIGN INNOVATION CENTER
  • DIC
    • What is DIC?
    • Design Courses
      • Signal Conditioning and Sensor Technology (SCST)
      • Environment and Watershed Management (EWM)
      • Improvement of Plant Growth (IPG)
      • Computer Aided Product Design (CAPD)
    • Fellowship
    • Internship
    • Staff
  • Members and Projects
  • Projects
    • Innovative Design
      • Waste Mangement
        • Incinerator
        • Composter
        • Grey water
        • Black water
        • Black solider fly (BSF)
        • Urine based project
      • Energy
        • Evaporative fridge
        • Chulha and cooker
        • Bio-gas
        • Solar appliances and automation
        • Dryer
      • Life Science
        • Soil Enrichment
        • Industrial Project
        • composting
        • Waste water treatment
        • Tissue Culture
        • Bio fertilizer
      • Agriculture
        • Irrigation
        • Hydroponics
          • Micro green
            • Sprouter
          • Fodder
        • Aquaponics
        • Aeroponics
        • Polyhouse Technology
      • Sensing Automation
      • Machines
      • Projects Against order
        • Measure weather
        • Prosthetic Hand
    • DST Fablab Project
      • Narmadalay Fablab
      • Palghar Fablab
      • Vigyan Ashram Fablab
    • Spreading Rural Innovations through D-I-Y Open Source Designs(La Fondation Dassault Systemes)
    • Fab School for Fab Village (La Fondation Dassault Systemes)
    • Atal Tinkering Lab
  • Videos
  • Downloads
  • About Us

Select Page

Window Grill

Posted by Harsh Palkar | Nov 16, 2024 | Uncategorized | 0 |

Window Grill

12/11/2024

Got this as welding assignment. I was asked to make a grill for window in the Vigyan Ashram. I took the measurements of the window first. Then I made a solidworks model of It and then did the Assembly of it.

13/11/2024

Did the cuttiong and grinding operation of the square bars required for grill.

16/11/2024 – 18/11/2024

I did bending of the square bars for the grill. It took me 3 days to do bending of all the square bars. There were total of 12 square bars i.e 5 horizontal and 7 vertical. It took me long time to perform bending because I didn’t knew how to do bending and even if I was able to bend it was not bending accurately according to the dimensions. So for that I took guidence of Jadhav sir. I bended vertical bars at a distance of 5.5 cm from both ends and bended horizontal bars 4.7 cm from both ends.

23/11/2024

Today I went to bring the flat patti with siddhant as I required it for making the frame of the grill. After I brought that I cut that into four pieces. Length of two pieces was 108 cm and the length of other two was 142 cm.

24/11/2024

For making the frame for the grill first I made a cut of 45 degrees on both ends of all four pieces of flat patti that I cut. By making that cuts will allow to make a frame of rextangular shape. First I made mark with the pencil on each end of the patti and then used hand grinder to cut.

After I gave 45 degrees cut at both ends of all the flat pattis I welded them in rectangular shape to make the frame. The welding type I used was Arc welding.

25/11/2024

After welding operation was done I did the grinding operation at all the corners of the frame.

26/11/2024

I did the welding operation of grill. Welded the square bars on the frame but before that I made holes on each side of the frame for fitting it on the wall. I made 3 holes on each side of the frame of diameter 8 mm.

First I welded the horizontal bars and then the verticals bars on top of that. After that I gave welding spots at each of the intersection point of vertical and horizontal bars. In this way welding of grill was completed.

29/11/2024

Did grinding of the grill.

In this way my Grill Assignment was completed.

Share:

Rate:

PreviousData logger
NextWELDING ASSIGNMENT

About The Author

Harsh Palkar

Harsh Palkar

Hi I am Harsh Palkar currently pursuing Btech in Agricultural Engineering at CAET, Dapoli. I am here at Vigyan Ashram, Pabal for 4 month internship.I have got project of Solar Electric Fencing which is to be done at Rajgurunagar where waste is processed.

Related Posts

April 29, 2019

Selection of sewage pump

Selection of sewage pump

March 6, 2022

Turbo ventilator fitting for smoke problem

Turbo ventilator fitting for smoke problem

February 13, 2022

EVAPORATIVE FRIDGE FOR VIGYAN ASHRAM KITCHEN

EVAPORATIVE FRIDGE FOR VIGYAN ASHRAM KITCHEN

June 20, 2017

Leave a reply Cancel reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.

Designed by Elegant Themes | Powered by WordPress