• Contact
  • Login
DESIGN INNOVATION CENTER
  • DIC
    • What is DIC?
    • Design Courses
      • Signal Conditioning and Sensor Technology (SCST)
      • Environment and Watershed Management (EWM)
      • Improvement of Plant Growth (IPG)
      • Computer Aided Product Design (CAPD)
    • Fellowship
    • Internship
    • Staff
  • Members and Projects
  • Projects
    • Innovative Design
      • Waste Mangement
        • Incinerator
        • Composter
        • Grey water
        • Black water
        • Black solider fly (BSF)
        • Urine based project
      • Energy
        • Evaporative fridge
        • Chulha and cooker
        • Bio-gas
        • Solar appliances and automation
        • Dryer
      • Life Science
        • Soil Enrichment
        • Industrial Project
        • composting
        • Waste water treatment
        • Tissue Culture
        • Bio fertilizer
      • Agriculture
        • Irrigation
        • Hydroponics
          • Micro green
            • Sprouter
          • Fodder
        • Aquaponics
        • Aeroponics
        • Polyhouse Technology
      • Sensing Automation
      • Machines
      • Projects Against order
        • Measure weather
        • Prosthetic Hand
    • DST Fablab Project
      • Narmadalay Fablab
      • Palghar Fablab
      • Vigyan Ashram Fablab
    • Spreading Rural Innovations through D-I-Y Open Source Designs(La Fondation Dassault Systemes)
    • Fab School for Fab Village (La Fondation Dassault Systemes)
    • Atal Tinkering Lab
  • Videos
  • Downloads
  • About Us

Select Page

Progress Report for [August] – Web Development and Testing Updates

Posted by Pranit Sankpal | Sep 13, 2024 | Uncategorized | 0 |

Progress Report for [August] – Web Development and Testing Updates

Introduction
This report outlines the key developments and tasks completed over the past month. The focus has been on creating new pages for specific features, improving user interface (UI) design, and initiating the testing phase for the website. The following sections detail the significant accomplishments during this period.

1. Creation of Dryer-Specific Page and Button Implementation
A new page was developed to enhance user navigation for accessing the appropriate dryer. A dedicated button was introduced, which, when clicked, redirects users to the corresponding dryer. This feature improves the user experience by simplifying access to dryer-specific content and functionalities.

2. Vigyan Ashram Kitchen Website Development
In addition to the dryer page, work commenced on the development of the Vigyan Ashram kitchen website. This project aims to create a streamlined and user-friendly interface to showcase the kitchen’s activities, initiatives, and relevant information. The initial stages of the website structure and design were laid out, with further refinements planned in the upcoming phases.

3. Website Optimization for Dryer_3
Work on the Dryer_3 website primarily focused on reducing load times and optimizing overall performance. The main objective was to enhance user experience by making the website faster and more responsive. Optimization efforts included reducing the size of assets, refining code, and improving server response times to minimize delays. As a result, the Dryer_3 website now offers a smoother, more efficient user interaction, particularly in high-traffic scenarios.

4. User Interface (UI) Updates for Dryer Page
Following the creation of the dryer-specific page, a series of UI improvements were implemented to enhance the visual appeal and user engagement. These updates focused on creating a more intuitive layout, refining color schemes, and ensuring that the design aligns with the overall theme of the website.

Conclusion
In summary, substantial progress has been made in the past month, with the completion of key features such as the dryer page, initiation of the Vigyan Ashram kitchen website, and the beginning of website testing. The next steps will involve further UI enhancements, expanding the scope of the kitchen website, and addressing feedback from the testing phase.

New Page for all dryers

Before Update

After Update

Share:

Rate:

PreviousForced Convection Solar Dryer
NextVESSEL STAND DESIGN

About The Author

Pranit Sankpal

Pranit Sankpal

Related Posts

Turbo ventilator fitting for smoke problem

Turbo ventilator fitting for smoke problem

February 13, 2022

ASSIGNMENT

ASSIGNMENT

April 30, 2019

Survey report for Autonomous Fruit Sorting and grading machine

Survey report for Autonomous Fruit Sorting and grading machine

April 29, 2021

Solar radiation intensity

Solar radiation intensity

April 18, 2023

Leave a reply Cancel reply

Your email address will not be published. Required fields are marked *