01/01/2020Reporting
02/01/2020To Visit in Vigyan ashram
03/01/2020To Introduction with all DIC Members
04/01/2020Introduction to Workshop (Machines and Tools)
06/01/2020Discussion on Solar and Thermal energy with Dixit sir and all DIC members
07/01/2020Assignments (To making a Shoes stand for 16 Shoes)
08/01/2020To Watching Shoes stand in ashram and to collecting the dimensions of stand and Information
09/01/2020Number of Shoes and their Height,Width and Length data collection
10/01/2020To making Design Sketch of stand and sanction with Amol sir
11/01/2020Material requirment
12/01/2020To Checking the avability of material in scrap
13/01/2020Selection of material
14/01/2020Costing of Shoes Stand
15/01/2020Working (Cutting,Welding)
16/01/2020Painting of stand
17/01/2020Project (Polyhouse Automation Design, Installation and Testing
18/01/2020To Measure a Temprature and Humidity of polyhouse at time interval
20/01/2020Discussion on Health and Food topic with Dixit sir and all DIC member