INTRODUCTION
This was my first main project that was given to me by Vigyan Ashram. This project is a Livestock Shed Modification sortout in Vigyan Ashram.
04/09/2024
Firstly, We were given individual projects by Prasad sir and I was given the project of the livestock shed problem. In that, I wanted to find out the problem of three sheds in the ashram means cow sheds, goat sheds, and poultry sheds. I wanted to contact bhanudas sir of the agriculture department of the ashram and understand the problem.
This is the rough list for livestock shed modification in Vigyan ashram:
After that, I met Bhanudas sir and we discussed it by telling me that I had been given a project on a livestock shed. Then in this discussion, Bhanudas sir was telling me about the problem in the livestock shed, and I wanted to note that problem in the notebook. After that, i made a rough sketch in my daily notebook because it would have been helpful for me.


11/09/2024
Firstly, I took the dimensions of the barn structure. In it length, width, height, and drainage system means gutter. After that, the size of the feeder was taken. They learned from the children what they do for cleanliness. After that, the dimensions of the goat shed, the length, width, and height of the inner and outer space. After that, the measurement of the feeder was taken.
13/09/2024
We had a review of every DIC member’s project. That meeting was taken by Kulkarni, sir. Kulkarni sir is the director of the Vigyan Ashram. sir reviewed the projects that have been given and how far the work of the projects has been completed.
Later asked me when I had come to the ashram and what I had done since then told sir about the sheet we made and discussed about livestock shed project with me.
Then i am watching some YouTube videos related to the cow shed, poultry shed, and also the goat shed, After that, I got some ideas related to the livestock shed problems.
14/09/2024
On this date, whatever problem I have defined, I will present it and discuss it with dixit sir.
15/09/2024
We had a review of every DIC member’s project. That meeting was taken by Dixit sir.
16/09/2024
Then our HOD S.K Jain sir came to visit. We all explained our project to our HOD. First we started with the Hydrophonics project which was given to Tejasvi Mhatre. She explained what is her actual project. Then next one is harsh, he is explained our project. how to use the electric fencing ? Then Jain sir told us the possible solutions for those project. Then we went to BSF chamber which was project given to Nivedita so she explained it to sir. After sir asked me about my project. that time i am told us about my project
17/09/2024
First, I had to draw the design of the manger, so I took the dimensions of the manger. While taking the dimensions, students from DY Patil College came to the ashram for a visit. I informed them about my project and explained what I would be working on in this project.


18/09/2024
Different parts of Manger have been designed in rough and solid work. And assembled that part.




20/09/2024
Completed the assembly yesterday and showed it to Prasad sir. So Prasad sir said, I don’t want direct design, I want engineering drawing. Then I went to the shed and got the exact dimensions of everything.


21/09/2024
After I took the dimensions of the shed yesterday, After taking the dimensions of the shed yesterday, I took out the engineering drawing, and showed it to Abhijit sir, but he said that such a drawing is not required. Then I started drawing again.



22/09/2024
Today our review was done. We filled out the Google form for our project. After filling out the Google form, we showed it to Dixit sir, but there were many mistakes in that form so he filled the form again.
23/09/2023
We all spoke to Prasad sir about the project. So sir said, do you know what work you are going to do next and for that we prepared a flow chart.

06/11/2024-08/11/2024
After that, the main design was to be drawn which is cow shade and goat shade. Because the ashram wanted this design as a reference. Because many farmers come, they don’t understand how to have structure means cow and goat shade in one shade. And if the ashram is to be built further, this structure was drawn for how it should be. For that, the sketch was drawn on the design page.


24/11/2024
Design as a reference for the drainage system in cow shade, he showed how the drainage system can be done further.



25/11/2024
After drawing the sketch design of the new design, it was taken to draw it in solid work. The following things were added to the design that was taken.


26/12/2024
Updated the design of the cow and goat shade.

29/12/2024
The calculation for bringing manger material is done as follows


01/12/2024
Prasad sir looked at the design and asked some questions: What was the volume of the previous manger? How much food is given in a day? How much food does a goat eat?
So my answer is that goats eat 4-5 kg of feed per day, and they are fed 3 times a day and 6-7 kg at a time. To find the volume of the previous manger, I took a container, weighed it, put food in it, and weighed it again. The rest is as follows.
weight = 172.22 g/L (0.1722 Kg)
Density= 172 kg/m3
Volume = Mass/Density = 6/172.2
Volume = 0.034m3
02/12/2024
Sir then asked me to figure out how much food I would put in the manger and how far the goat’s neck goes down. And can the manger you make eat the comfortable? I was asked to observe this.

03/12/2024
After showing all things, sir said that out of all the rooms in goat shade, a Sketch design of a single room was taken out. Because he will understand sir clearly.

04/12/2024
A bill of materials was drawn to make the manger because the signature of the head should be taken while purchasing the materials.

06/12/2024
Updated the Design.



07/12/2024
Out of all the rooms in goat shade, a solid work design of a single room was taken out.



08/12/2024
After discussing with Dixit Sir, the fabrication of manger was started and it was already an L angle, so he asked to use the same L angle. Then L angle cut was done.


09/12/2024
The parts that are cut are joined by welding.


10/12/2024
For separation in Manger, the sheet is cut and the sheet is welded.


11/12/2024
After welding all the parts, the sheet was required, Dixit took the sign from Sir bought the sheet from the village, and then cut the sheet.



12/12/2024
If the outer part of the manger was completed, the sheet had to be bent, so I bent that sheet on the bending machine and started welding.


13/12/2024
Finished the welding and left it to the manger. And took the handle from both sides. Grading was also done in it.


14/12/2024
After welding manger 3 in 1 acid cleaned it and then powder coated it. Then after applying the powder, put it in the oven and heat it, then take it out after 6 to 7 hours.