Drawing/Sketch:-

Drawing /Measurements:-

Bill of Materials:-

SR. NOMaterialsUnitQtyCost
1Square Tube ( 40x40x3 mm )NOS21,200
2Plastic Bucket ( 5 litter )NOS5500
3Submersible Tillu Pump ( 55 Watt )NOS1750
4Dripper Pipe  ( 12 ft. )Meter1150
5Plastic elbow ( 16 mm diameter )NOS375
6Plastic T  (16 mm diameter  )NOS4120
7Water tant ( 50 letters)NOS11,000
8On off timer (230 volts and 30 amp )NOS1850
9Black drip rubber ( 16mm diameter )NOS550
10Black oil paintliter1350

Description of Materials:-

  • Ground Base:-
    • Assembly: Clear the surface below and make it flat. The water level at the ends on the boundary should be 0.
    • Dimensions: W=
  • Hydroponic Stand:-
    • Make a rectangular frame of dimensions = 2286 mm x 300 mm
    • Connect four legs of 450mm at the bottom, at an angle (pointing outside)
    • Add supporting structure for the buckets, at a distance of 380 mm from each other.
    • Lastly, weld an ā€œIā€ shaped structure at the bottom with dimensions = 413.34 mm x 2100 mm
    • Paint the structure
  • Plastic Bucket:-
    • Purchase five market available buckets of height = 200 mm and diameter = 200mm
    • Make a 16 mm hole at the bottom of each bucket
    • Add small pieces of bricks and coarse sand before planting the sapling inside the bucket
  • Water Tank:-
    • To store water for the system, a 50 L tank must be kept on the ground, below the bucket levels.
  • Submersible Pump (Tillu ):-
    • Insert a submersible pump at the bottom.
    • Specification: 220V, 55 watt
    • This will allow easy flooding as well as draining of the system.
  • Dripper Pipe:-
    • Connect 16mm x 12ft dripper pipes to the pump and the bucket to flood and drain the system.
  • Plastic T:-
    • To multiplex the single channel coming from the pump into 5 channels, attach 4 T connectors in the center
  • Plastic Elbow:-
    • To connect the ends of the dripper pipe use elbow connections.
  • Black Drip Rubber:-
    • To prevent leakage of water from the bucket, attach black drip rubber to the hole in the bottom and insert the pipe into it.
  • On off timer:-
    • The system runs in a cycle of flood and drain, so the pump should be switched on and off.

Fabrication:-

  • Material processing
  • Welding fabrication
  • Painting
  • Plumbing
  • Electrical supply

Installation:-