Week 1:

OBJECTIVES-

  1. To measure the area of construction and draw the plan on sheet.
  2. To measure heights by using dumpy level.

Before starting actual work, we take the measurements of 1st hostel, 2nd hostel and toilets for deciding the actual position of water tank, toilets, grey water filter and septic tank and draw the plan on sheet. Then we measure the whole area of construction where we have to done the actual work.

komal

IMG_20160605_164346

we observed that this area having natural slope. So, we have decided that by using natural slope we placed the grey water filter on height. Therefore we measure the heights by using Dumpy Level.

IMG_20160605_164028