Field trial at VA campus
The first of the Dome dryer version 2.1 build was installed at Vigyan ashram’s Campus for...
Read MoreThe first of the Dome dryer version 2.1 build was installed at Vigyan ashram’s Campus for...
Read MoreObjective: The objective was to take the 3D design workshop in Amboli’s school on 22nd March...
Read MoreObjective: The objective was to update all DIC blog data from old DIC site to new blog site of...
Read MoreIntroduction: I made posters of Vigyan ashram tour. I made it in Corel draw software. I chose this...
Read MoreLemon processing:- We purchased 19 kg of lemon and 7 kg of edlimbu which cost us 400rs. Lemon juice was process from 14kg to 4.6liters and 7 kg was waste wet peel and 2.5 kg residue was collected during the filtration of orange...
Read More