Material used for preparation of bed :

  1. Square tubes
  2. Plywood
  3. Welding rods
  4. Color
  5. Touchwood
  6. Primer ( Redoxide )
  7. Brushes
  8. Thinner


PROCESSES PERFORMED DURING BED PREPARATION:

  • Cutting
  • Welding
  • Grinding
  • Painting

TABLE :  COST ESTIMATION

Material Cost :

Sr. noProduct nameTotal productsRateCost (Rs)
12* 1 tube18 ft19.5/ft351
2¾ * 3/4 tube12.1 ft8/ft96.8
31.5 * 1.5 tube7 ft25/ft175
4Plywood2.42*5.74 ft255/ft2764
5Welding rod252.5/rod62.5
6colour250 ml250/1000ml62.5
7Touchwood250 ml300/1000ml75
8Primer250 ml180/1000ml45
9Brush2 (2 inch)50100
10Thinner250 ml140/1000ml35
  • Labour cost is 15% of total material cost
  • Labour cost = 1767 * 0.15 = 265(Rs)
  • Electricity cost is 10% of total material cost
  • Electricity cost = 1767 * 0.10 = 178(Rs)
  • Total cost = 1767+265+178=2210(Rs)
  • Labour cost = 1767 * 0.15=265 (Rs)
  • Electricity cost is 10% of total material cost
  • Electricity cost = 1767 * 0.10=178(Rs)
  • Total cost = 1767+265+178=2210(Rs)