INTRODUCTION

I join to Prathamesh and Mahesh to make a fish dryer as there were three fish dryer orders in Vigyan Ashram.

The Durgadevi Mahila Swayamsahayat Bachatgat, Shelu they need three dryers for there Bachatgat.

In Detail (Fabrication Work):-

I started my work from this blog, Read this blog.

FLAT SOLAR FISH DRYER

Hand Sketch Diagram
All Componants.

28 April

The first thing Prathamesh was cut the material before I joined them.

The rest of the wood cutting, nut bolting, coloring, assembling the body knit and clear welding work remains to be done.

Mahesh and I will combine the body of the fish dryer and make sure that it is perfect.

Then we cut the piece of wood and reattached it to the body and it was just right.

29 April

We just separate all three dryers and then we send them for coloring work with black paint.

We then put a black sheet of poly plastic and then covered the top with plywood for the purpose of absorbing more solar radiation.

30 April

We reassemble it and make sure it’s accurate because we don’t get the nuts and bolts tightened in the holes.

Once the paint is done we install the doors for the fish dryer.

2 May

Mahesh and I take the fish dryer to the place where to deliver it and get ready to use it.

They remove the upper layer of polythene plastic because its new sheets covered with plastic due to cause of dust and scratch proof.

Today I called Nanda Chorghe to get follow up for the Flat Bed Polycarbonate Solar Fish Dryer and they put the things to dry are follow:-

NameBefore Quantity (kg)After Quantity (kg/gm)SmellColor
Onion 505As it isWhite
Papad1/2800As it isAs it is
Green Chilli11/2As it islite Green